No PROJECT CLIENT SCOPE OF WORK STATUS
28) FOUR LANNING FAGNE-GUJARAT-MAHARASHTRA BORDER SECTION OF NH-6 FROM Km 510.00 TO Km 650.794 (PACKAGE 3) IN THE STATE OF MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) PROJECT ON DBFOT PATTERN UNDER NHDP PHASE 3 NATIONAL HIGHWAYS AUTHORITY OF INDIA COMPLETED
29) EMABNKMENT STABILITY ANALYSIS FOR BRIDGE ON THE RIVER FULAHAR AT NAKATTI POINT IN THE DISTRICT OF MALDA, WEST BENGAL GOVERNEMNT OF WEST BENGAL, PUBLIC WORKS (ROADS) DIRECTORATE NATIONAL HIGHWAY WING COMPLETED MARCH 2017
30) ROB IN RAJASTHAN LC 53,70 AND 74 SOJAT, JAWALI, RANI DFCCIL, AJMER CASTING OF PANEL FACIA AND ERECTION IN PROGRESS
31) ROB IN RAJASTHAN (JAISALMER) NATIONAL HIGHWAYS AUTHORITY OF INDIA COMPLETED NOV-2018
32) FOUR LANNING OF KAGAVADAR-UNA SECTION OF NH-8E FROM KM 139.915 (DESIGN CH: Km 140.470) TO Km 180.478 (DESIGN CH: Km 181.450) IN THE STATE OF GUJARAT THROUGH (PPP) ON HYBRID (ANNUNITY) MODE UNDER NHDP PHASE IV NATIONAL HIGHWAYS AUTHORITY OF INDIA CASTING OF PANEL FACIA AND ERECTION IN PROGRESS
33) ROB IN RAJASTHAN (ABU ROAD) RAJASTHAN STATE ROAD DEVELOPMENT CORPORATION LIMITED CASTING & ERECTION OF BLOCK FACIA IN PROGRESS
34) CONSTRUCTION OF RAILWAY OVER BRIDGE AT CROSSING NO. 427 MALGADA FATAK TO BHADROLI GWALIOR, MADHYAPRADESH THE CHIEF ENGINEER P.W.D. BRIDGE CONSTRUCTION ZONE, BHOPAL, MADHYAPRADESH CASTING & ERECTION OF BLOCK FACIA IN PROGRESS
35) FOUR LANNING OF GWALIOR-SHIVPURI SECTION OF NH-3 FROM KM 15+600 OF NH-75 TO KM 236+000 OF NH-3 IN THE STATE OF MADHYAPRADESH ON BOT (TOLL) UNDER NHDP PHASE IV ON DBFOT PATTERN (END OF GWALIOR BYPASS) NATIONAL HIGHWAYS AUTHORITY OF INDIA COMPLETED JUNE 2018
36) DETAILED ENGINEERING SERVICES FOR DEVELOPMENT AND UPGRADATION OF EXISTING 2-LANE TO 4-LANE CONFIGURATION STRETCH OF NH-17 (NEW NH-66) FROM KM 205.400 (PARSHURAMGHAT)TO KM 241.300 (ARAWALI)IN THE STATE OF MAHARASHTRA UNDER NHDP-IV ON HYBRID ANNUITY MODE (PACKAGE II) NATIONAL HIGHWAYS AUTHORITY OF INDIA PANELS DRAWINGS APPROVED AND PANELS CASTING, ERECTION IN PROGRESS
37) REHABILATION and UPGRADATION OF NH-66 (OLD-NH-17) FROM Km. 161/000 TO 205-400 KASEDI-PARSHURAM GHAT SECTION) TO FOUR LANES IN THE STATE OF MAHARASHTRA UNDER PHASE IV ON DBFOT HYBRID-ANNUITY NATIONAL HIGHWAYS AUTHORITY OF INDIA PANELS DRAWING APPROVED
38) RMA - BPL NEW (B.G.) RAIL LINE PROJECT-KOTA DEVESION (ROAD OVER BRIDGE NO. 8 and 18) WESTERN CENTRAL RAILWAY PANELS DRAWING APPROVED
39) REHABILITATION AND UP-GRADATION OF SINDOOR RIVER TO START OF BARELI BYPASS SECTION ON NH-12 FROM EXISTING KM 130/10 TO KM 194/0 (DESIGN CH 130.000 TO 193.000) TO FOUR LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYAPRADESH NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. PANELS DRAWING APPROVED, ONE VUP DRAWING APPROVED
 
<